OPEN PARA LA SEGURIDAD Y EL RENDIMIENTO
Mejore la seguridad y el rendimiento de su planta gracias a la gestión de alarmas, la supervisión de rendimiento y de activos, la visualización web de datos, la optimización, el control avanzado y la sintonía con la nueva herramienta TaiJi.
Repiensen sus métodos de trabajo y obtengan resultados inmediatos gracias a nuestros servicios, nuestra capacitación y nuestra pericia en asesoría. Manejen el cambio inteligentemente con nuestras soluciones probadas.
May 2005
In this issue
| Classes and seminars | |
| About us | |
| Trick for this month | |
| To contact us |
See our previous issues :
http://www.topcontrol.com/techinfo/news.php
|
|
Classes & seminars
Milwaukee, WI, June 6-10
EX-501-3 - Detailed Loop Analysis with ExperTune and
EX-502-3 - ExperTune Advanced Tools
You can attend both classes in 1 week from June 6 to 10.
SAIL Amsterdam 2005
From 17 to 22 August 2005, Amsterdam will be the home port to one of
the biggest maritime event in the world for the seventh time, SAIL
Amsterdam 2005. For six days, Amsterdam will be a vibrant exhibition of
historic ships and nautical heritage. During SAIL Amsterdam 2005, about
20 Tall Ships are expected in Amsterdam harbour, together with 500
historic sailing and motorboats. More information on www.sail.nl
Michel Ruel from Top Control will present the class:
ME-200-3 - Analytical methods for troubleshooting and Control loop tuning, August 22-24
The first 5 inscriptions will receive free tickets for an exclusive
Sail Amsterdam 2005 boat night tour on the 21 of August on a sailboat.
Highlight will be the special firework show at 11.30 PM.
|
|
See our 2005 calendar, Classes & Seminars :
See at : http://www.topcontrol.com/training/tcalendar.php
|
|
Trick for this month : Noise or Disturbance?
When a disturbance occurs, will PID controller succeed to reject it?
First, we need to determine which periods can be rejected.
Loop tuned to reject disturbances:
- tsettling ~ 10 · td
Loop tuned to reach SP at a certain speed:
- tsettling ~ 4 ·

is the time to reach 63% of SP change;
is usually ~ 3 ·
process)
When a disturbance happens faster than settling time, it is noise and PID controller will not reject this disturbance. In such a case, a filter is added on PV to ensure the controller will not fight this quick disturbance and apply this noise to its output, causing useless valve movement and wear.
Hence :
- if period < tsettling, filter will mask noise;
- if period > tsettling, PID will reject disturbance.
The filter time constant is :
F ~ td /5
or
F ~ tsettling /50
or
F ~
/10
Watch filters with too long time constant!
|
|
Comments, suggestions and requests are welcomed. Please e-mail us at: info@topcontrol.com
You are welcomed to visit our web site :http://www.topcontrol.com
|
49 Bel-Air Street, Lévis, QC
|
|
|
1020 James Drive, Suite A
|









