OPEN PARA LA SEGURIDAD Y EL RENDIMIENTO

Mejore la seguridad y el rendimiento de su planta gracias a la gestión de alarmas, la supervisión de rendimiento y de activos, la visualización web de datos, la optimización, el control avanzado y la sintonía con la nueva herramienta TaiJi.

Repiensen sus métodos de trabajo y obtengan resultados inmediatos gracias a nuestros servicios, nuestra capacitación y nuestra pericia en asesoría. Manejen el cambio inteligentemente con nuestras soluciones probadas.

Asociado certificado

February 2007

In this issue

puce Conferences
puce Classes
puce Trick of the month: Using Performance Supervision Software
puce To contact us


Conferences And Shows

EXFOR February 6 to 8 2007
Palais des Congrès, Montreal, Quebec
Come visit us at booth 2010.

"Lime Kiln Control Strategies" by Martin Emond and Serge Naud

"Exploiting Process Historian Data to Improve Process Performance" by Michel Ruel
PAPTAC 2007,
International paper week 2007
To learn more...



Upcoming Classes And Seminars

Detailed Loop Analysis With ExperTune
February 26-28, Indian Rocks Beach, FL

ExperTune Advanced Tools
February 28-March 2, Indian Rocks Beach, FL

PlantTriage - Performance Supervision And Process Control Optimization
March 6-8, Cincinnati, OH

Analytical Methods For Troubleshooting And Control Loop Tuning
March 12-14, Port of Spain, Trinidad & Tobago
March 20-22, Calgary, AB

Seminar On Process Optimization And Performance Assessment Techniques Using PlantTriage
March 15-16, Port of Spain, Trinidad & Tobago

Control Valve Selection
March 27-29, Ottawa, ON

See our 2007 courses calendar



This Month's Tip : Using Performance Supervision Software

Some examples...

Before a planned shutdown, prioritized lists (based on economic weight) are extracted

  • Transmitters with problems
  • Sticky valves
  • Loops to be tuned

Weekly reports

Management
  • Area performance
  • Trends

Production
  • Sector performance
  • Percentage of loops that are not working in normal mode
  • 3 loops needing tuning
  • 3 loops where set point changes are frequent

Engineering
  • Prioritized lists of undersized valves
  • Prioritized lists of loops that are not in control

Maintenance
  • Prioritized lists of loops needing attention
  • Non performing areas

Actual situation

  • Treemap showing hot spots. For example, the following graphic illustrates a 1 000 loop system where:
    • Rectangle size represents the economic weight
    • Color represents the oscillation index of loops where oscillation comes from the valve
    • Hence, we are looking for large red rectangles!

We can help your team build and structure these reports…


To Contact Us

puce Lévis' office +1 (418)834-4321
puce Pointe-Claire's office +1 (514)695-3492
puce Hartland's office (877)867-6473
puce Toll free (877)867-6473
puce Email info@topcontrol.com