OPT FOR SECURITY AND PERFORMANCE

Improve the security and performance of your plant with alarm management, performance supervision, asset supervision, web-based data visualisation, optimisation, advanced control, and tuning with the new TaiJi tool.

Rethink your working methods and obtain immediate results thanks to our services, trainings, and consulting expertise. Manage changes intelligently with our proven solutions.

 certified service provider

September 2005

In this issue

puce Classes and seminars
puce About us
puce Trick of the month
puce To contact us

See our previous issues :
http://www.topcontrol.com/techinfo/news.php



Classes & seminars

Dr Hank Brittain from Top Control presented the seminar: SE-100-3, Modern Methods in Process Control
in Bangkok : August 30 - Sept. 2, 2005,
at the Petroleum and Petrochemical Engineering College, Chulalongkorn University, Bangkok, Thailand
in Malaysia : September 5-7, 2005

EX-501-3 - Detailed Loop Analysis with ExperTune
September 20-22, 2005 - Milwaukee WI

ME-200-3 - Analytical Methods for Troubleshooting and Control Loop Tuning
October 18-20, 2005 - Kingston, ON


About us

See our 2005 calendar, Classes & Seminars :

See at : http://www.topcontrol.com/training/tcalendar.php


Representative

Mr. Tim Horseman from E.B. Horsman in Surry is the new Top Control representative for British Columbia.


Article

An article by Martin Emond is published in Control Magazine, September issue:
"What's wrong with those ramps"


Conference by Michel Ruel at ISA 2005 Chicago

Benchmarking your Process Using Simple Key Performance Indices
Performance Management
Thursday, October 27th
Time : 2:00 p.m. - 3:30 p.m.

Performance Monitoring and Supervision - an Economic Point of View
Economics of Asset Management
Wednesday, October 26th
Time : 3:45 p.m. - 5:15 p.m.



Trick of the month : Linear process?

A process is linear when it behaves identically independently of the type of signal sent to the final element.

For example, is the response identical for :

  • Small and large changes?
  • Increasing and decreasing?
  • Small and high flows?
  • Low and high loads?
  • Slow and fast changes?
  • Simple and multiple changes?
  • etc.

If one of the answer is no, the system is non linear. It is essential to verify linearity before tuning a loop.

If non linear, it should be modified repairing final element (stiction, hysteresis, asymmetry, inherent characteristic, positionner), modifying control strategy, modifying characterizer (input or output) or modifying process.

If the system is still non linear, tuning parameters must be calculated using the worst case to ensure the system is always stable (and meets selected tuning criterion).



To contact us

Comments, suggestions and requests are welcomed. Please e-mail us at: info@topcontrol.com

You are welcomed to visit our web site :http://www.topcontrol.com

puce

49 Bel-Air Street, Lévis, QC
G6V 6K9, Canada
Phone: (418) 834-2242
Fax: (418) 834-2651  

puce

1020 James Drive, Suite A
Hartland, WI 53029
Toll free: (877) 867-6473